Open Spaces and Landscape Planning
Brigade Autograph is being presented as a development with a substantial open-space component. Available project information refers to approximately 80% open space in the township planning.
Open areas can include landscaped gardens, internal roads, pathways, recreational zones, setbacks and other unbuilt portions of the site. Therefore, the overall open-space percentage should not automatically be interpreted as the percentage of land covered entirely by greenery.
For buyers, the master plan is the best way to understand how landscaped areas, amenity spaces, tower locations and vehicle movement are arranged. The relationship between tower spacing, sunlight, ventilation and privacy can also be assessed through the approved plans.
Construction and Structural Design
The residential towers in the registered first phase are planned with a structure of four basement levels, a ground floor and 48 upper floors.
The project information also describes an RCC-framed structural system with shear-wall technology. These are structural design elements used in high-rise construction to provide strength and stability.
Buyers should refer to the structural engineer's certificates, sanctioned building plans and technical specifications filed with the relevant authorities for the precise structural details. General descriptions of earthquake-resistant design should not replace a review of the actual engineering documents.
Brigade Autograph RERA Registration
The registered first phase of Brigade Autograph is listed under the name Floris & Commercial at Brigade Autograph with the Karnataka Real Estate Regulatory Authority.
The RERA registration number is:
PRM/KA/RERA/1251/446/PR/071126/009091
The registration was approved on 7 November 2026. The registered promoter is Ananthay Properties Private Limited, a subsidiary of Brigade Enterprises Limited. The proposed completion date recorded for the registered phase is 30 June 2032.
Buyers can verify the registration by visiting the official Karnataka RERA website and searching by the project name or registration number.
RERA registration is an important part of the home-buying process, but buyers should also examine the registered plans, apartment details, promoter information, completion date and agreement documents. If the overall township is being developed in multiple phases, check whether the particular tower or apartment being considered falls within the registered phase.